Capability-specific questions
How is asphalt resurfacing done on a live school playground?
The existing asphalt is removed and replaced, often with associated drainage, sub-base replacement, line marking and equipment, while the school stays open. The site is secured with fencing and full-time supervision spots machinery movement so works proceed safely around students. Monument has delivered asphalt resurfacing at Athelstane Public School (Arncliffe), Beresford Road Public School (Greystanes) and Ebenezer Public School.
Monument Environments
Boutique principal contractor for NSW government and institutional clients, specialising in construction inside operational environments that cannot be shut down. Established 2006. ISO 9001, 14001 and 45001 certified. Prequalified SCM 0256 and SCM 1461.
