Delivering in live and high-risk environments
Who is responsible for safety when construction happens on a school or public site that stays open?
Both the principal contractor and the school, council or facility hold duties at the same time. Under the Work Health and Safety Act 2011 (NSW), the principal contractor manages safety in the construction zone it controls, the facility keeps its duties to its own staff, students and visitors, and where their duties overlap, each must consult, cooperate and coordinate with the other.
Responsibility is shared, and the fence line marks where each party leads. The principal contractor manages safety inside the construction zone, while the school, council or facility keeps its duties to the people who use the rest of the site.
The law expects them to work together. Under the Work Health and Safety Act 2011 (NSW), more than one business can hold a duty for the same matter. Each one has to consult, cooperate and coordinate with the others, so far as is reasonably practicable.
The contractor's duties
The principal contractor controls the construction zone and answers for what happens inside it. Its duties include:
- securing the zone so nobody can wander in
- preparing the WHS management plan
- collecting safe work method statements for high-risk work
- making sure every worker is inducted before they start
Those duties are set out in what a principal contractor is responsible for, and the plan itself in what a WHS management plan is.
The facility's duties
A school does not hand over its duty of care when a builder arrives. Its staff still supervise students and its emergency procedures still apply. Its own workers, from cleaners to grounds staff, still need to be safe.
It also knows things the contractor does not. Where the hazardous materials are, which routes students take between classes and when the site is busiest all go into the plan before work starts.
The fence line
Most of the coordination happens where the two areas meet. Gates, delivery routes through school grounds and driveways shared with parents are each agreed in writing, with set times for plant to move.
On Monument's sites, the controls include secure hoarding and fencing, separate access for people and vehicles, and full-time supervision of every plant movement. High-risk work is scheduled away from the busiest times of day. The full list is in safety controls around students and the public.
Contractors engaged by the client
The school or council often has its own contractors on site at the same time, such as cleaners, maintenance trades or IT installers. Each is a business with its own duties. Their work near the construction zone is planned with the builder, so nobody walks into a hazard they were not told about.
The arrangements in writing
Who leads what is settled at the start, usually at the pre-start meeting. The contacts for each side, how incidents are reported both ways and how changes to the boundary are agreed all go on record.
Monument's system
Monument works as principal contractor. It holds the head contract and carries accountability for programme, quality and safety from start to finish, and its safety controls operate under an ISO 45001 certified safety management system, achieved in 2024.
Related
Monument Environments
Boutique principal contractor for NSW government and institutional clients, specialising in construction inside operational environments that cannot be shut down. Established 2006. ISO 9001, 14001 and 45001 certified. Prequalified SCM 0256 and SCM 1461.
